BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//EURODYN//Schedule//DE
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/Berlin
X-LIC-LOCATION:Europe/Berlin
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:19700329T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:19701025T030000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=-1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
UID:594@eurodyn2026.org
DTSTAMP:20261026T144037Z
DTSTART;TZID=Europe/Berlin:20261001T123000
DTEND;TZID=Europe/Berlin:20261001T125000
SUMMARY:A smartphone vibration-based technique for measuring and monitori
 ng tension forces within guy wires supporting steel towers of electricit
 y transmission lines
LOCATION:Room F102
DESCRIPTION:MS 14\n\nPresenter: Bouaanani\, Najib\n\nAuthors: Bouaanani\,
  Najib\n\nChair: Papadimitriou\, Costas\n\nAbstract: Steel towers are am
 ong the critical components required to manage power flows through safe\
 , efficient and reliable electrical transmission networks. Many steel to
 wers are guyed self-supporting towers\, the structural performance and s
 afe behaviour of which depend on the tension force of guy cables.   This
  paper will describe the development and experimental validation of a ne
 w fast and reliable technique to assess the tension within the cables su
 pporting guyed towers for transmission lines. The developed technique is
  based on cable accelerations measured using smartphones\, then FFT-tran
 sformed into the frequency domain to obtain the natural frequencies of t
 he guy wires.  The algorithms programmed into the Smartphone will be dis
 cussed and compared in terms of efficiency and accuracy. An equation is 
 used next to determine the tension within guy wires based on the obtaine
 d vibration frequencies. Various equations are tested and verified again
 st finite element analysis results of guy wires with various configurati
 ons and properties. Comparison of the results to those from simplified m
 ethods is also presented.   The proposed technique was validated experim
 entally in the laboratory and under in-situ conditions of actual guyed t
 owers of existing transmission lines. Several results will be presented 
 and discussed to illustrate the performance of the technique proposed in
  terms of efficiency and accuracy.