BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//EURODYN//Schedule//DE
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/Berlin
X-LIC-LOCATION:Europe/Berlin
BEGIN:DAYLIGHT
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
DTSTART:19700329T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:19701025T030000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=-1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
UID:564@eurodyn2026.org
DTSTAMP:20261026T144037Z
DTSTART;TZID=Europe/Berlin:20260930T125000
DTEND;TZID=Europe/Berlin:20260930T131000
SUMMARY:Dissipative Rolling Contact During Multi-Payload Lift Operations
LOCATION:Room A310
DESCRIPTION:MS 08\n\nPresenter: Rome\, Tyler\n\nAuthors: Rome\, Tyler\; F
 erri\, Aldo\; Adams\, Christopher\; Singhose\, William\n\nChair: Dimitro
 vova\, Zuzana\n\nAbstract: Cranes are often used to move large payloads 
 with circular cross sections for use in construction and manufacturing p
 rocesses. It is well known that movement of these suspended payloads can
  induce undesirable swing oscillations. However\, rolling and sliding fr
 ictional contact between payloads and contact between payloads and the e
 nvironment can also induce undesirable effects. Existing approaches for 
 modeling rolling contact tend to rely either on the restriction of rolli
 ng to constant velocity motion or on computationally heavy techniques su
 ch as finite-element analysis. Additionally\, most existing macroscopic 
 models for rolling contact fail to account for differences in the contac
 t force when examining rolling between two circular bodies versus rollin
 g contact between a circular body and a plane. This work applies a novel
  model for rolling contact to the simultaneous lifting of multiple circu
 lar payloads. Furthermore\, an algorithm is proposed for the handling of
  rolling contact and potential slip when a body has multiple points simu
 ltaneously in contact. Simulations investigate the impact of rolling res
 istance\, payload properties\, and rigging cable connections on the swin
 g of suspended payloads and the system settling time following a hoist o
 peration.
URL:https://eurodyn2026.org/submission/564
END:VEVENT
END:VCALENDAR